Suedhemmern on the Mittelland Canal v 5.0

Suedhemmern-on-the-Mittelland-Canal-v-5.0-1 Suedhemmern-on-the-Mittelland-Canal-v-5.0-2 Suedhemmern-on-the-Mittelland-Canal-v-5.0-3

New in 5.0 version:
– New biogas plant
– Installed doors with opening times
– Instaled built waterway (moving ships on the canal)
– Instaled built trains (2 freight trains)
– Supplemented mill and rebuilt Colii from the pasture
– Fences removed

Author: GMCW


Leave a Reply

Your email address will not be published. Required fields are marked *

Human Verification: In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.